A rendering of Lexington Medical Center (right) and the Graduate Medical Education building (left). The new medical education building will be built alongside the 52,000-square-foot medical center that the College of Nursing will move into in July 2024 after its 15-month construction stint.
LMC_Secondary.jpeg
